View full size image

Caption:

Fighter aircraft taxi down the flightline at Langley Air Force Base, Va. during a Phase 1 Operational Readiness Inspection Aug. 12, 2004.  34 of the 1st Fighter Wing’s F-15s were generated to deploy to "Base X" The Phase 1 Operational Readiness Inspection is an evaluation of the 1st Fighter Wing's ability to prepare and deploy personnel, equipment and support assets to a combat environment. The inspection consists of four graded areas: initial response and deployment, employment, ability to survive and operate (ATSO) and combat response.  (U.S. Air Force Photo by Tech. Sgt. Ben Bloker)

More detailed information for US Military equipment and procedures is available in the Data Store


US Military Equipment Technical Manuals | US Army Field Manuals | Marine Corps Warfighting Manuals | US Navy Non-Resident Training Course (NRTC) Manuals | 3D Military Computer Models

Photo description

Photo Date
Not available
Photographer
Not available
Caption Writer
Not available
Copyright Status
Public domain / free use
Service Branch
US Air Force
Primary Equipment
F-15
Other Visible Equipment
Not available
Plane Number
Not available
Base
Not available
Tail Code
Not available
Squadron
Not available
Comments/Notes
Not available